Sylvania shatters changeover paradigm (sidebar)

At its St. Mary’s, PA, plant, lamp manufacturer OSRAM Sylvania reduced the number of parts for changeover on a key cartoner from 36 to zero. It also reduced changeover time by more than 90%.

This bow to lean manufacturing permits Sylvania’s production to align itself better to just-in-time manufacturing, according to packaging superintendent Mel Interiano.

In late 2002, Interiano brought in Jerry Claunch & Associates. Along with Sylvania personnel, Claunch focused on one packaging line, the most critical part of which was a 5-year-old cartoner that inserts lamps (incandescent light bulbs) into cartons or fluted sleeves.

Researched List: Engineering Services Firms
Looking for engineering services? Our curated list features 100+ companies specializing in civil, process, structural, and electrical engineering. Many also offer construction, design, and architecture services. Download to access company names, markets served, key services, contact information, and more!
Download Now
Researched List: Engineering Services Firms
Annual Outlook Report: Workforce
Hiring remains a major challenge in packaging, with 78% struggling to fill unskilled roles and 84% lacking experienced workers. As automation grows, companies must rethink hiring and training. Download the full report for key insights.
Download Now
Annual Outlook Report: Workforce