Best practices for buffering and end-of-line design

There are some special considerations for packaging line buffering as it relates to the end of the line.
Print Reprint
FILED IN:  Machinery  > Case packing
     

1. Set increasingly higher capacity downstream. A rule of thumb is for the first machine upstream to have 110% of the capacity of the second, and so on, in intervals of 10%. If calculations show that a piece of modern equipment has 95% availability, this can be  pared to allow the downstream machine to draw product away 5% faster when run in a catch-up mode to avoid backups. A 150/min bottling line that experiences five minutes of downtime will need downstream equipment to absorb 750 bottles. The key is to have 20% to 40% extra speed and capacity downstream to allow the line to catch up after a downtime incident. Over-specifying downstream capacity is a key to recovering from stoppages. It also helps smooth out system flow perturbations.

2. Find the line’s “sweet spot” by determining the process centerline. Some lines run best at breakneck speed; others are most efficient at a slow and steady pace. Practitioners of the manufacturing and packaging art often make the mistake of setting speeds too high, too close to design specifications. One failure can be disastrous to productivity. Installations vary, but trial and error become evident when you document your results to arrive at the optimal combination of speed and product quality on a balanced line with minimal upsets or downtime. Trained personnel can choose from a wide array of statistical analysis tools to arrive at the right speed for your equipment and overall line.

Related Sponsored Content

3. Leave sufficient space between machines. Just as automated lines are often set to run too fast, machines on automated and highly integrated lines are often spaced too closely to one another. If automation isn’t state of the art and fully trusted, plan sufficient space between machines and stations to allow for placement of buffer zones. Designing in reliable unit operations can help to minimize buffering requirements, so if floor space is at a premium, focus on equipment reliability, especially generous tolerances for material variations.

4. Prevent stoppages at the case packer. Case packers can be sources of inefficiency, as seen in situations where corrugated materials or gluing fail to meet specifications. This can back up upstream processes and cause upstream line stoppages and reworks, wasting all the efforts to maintain high production efficiencies upstream. Buffering can be minimized or eliminated when off-spec product and materials are quickly, automatically inspected and rejected from the line to prevent hiccups. Bear in mind that it can be very difficult to put containers back into a close-coupled line without knocking over other containers and causing further problems. Choose your case-packing solution well, with reliability carrying just as much importance as speed.

5. Don’t let your accumulator reach top capacity. For some accumulators, such as a vertical carton accumulator, a completely filled accumulator requires the line to be stopped and cartons to be unloaded. If there’s not enough floor space to unload them, or if the downstream machine isn’t sufficiently fast, you may find your line running an empty filler.

Remember… reliability is king, and buffering is your insurance policy.

Liked this article? Download the entire playbook here.

Comments(0)

Add new comment

E-BOOK SPECIAL REPORT
42 Best Package Designs
Sign up to receive timely updates from our editors and download this e-book consisting of our editors' picks of most notable package designs. Updated for 2014!
x

Newsletters

Don't miss intelligence crucial to your job and business!
Click on any newsletter to view a sample. Enter your email address below to sign up!
GENERAL INTEREST
PACKAGE DESIGN/DEVELOPMENT
Each newsletter ranges in frequency from once per month to a few times per month at most.